START WITH STRUCTURE
How to prepare the device register for import?
A good registry starts with consistent locations and IDs, not row counts.
Read the guide02PREWENCJA
From schedule to inspection report
An inspection should connect the deadline, responsibility and documented result.
Read the guide03MOBILE WORK
What to check before working without the network?
Offline helps preserve selected operations, but requires conscious synchronisation.
Read the guide04ORGANIZATION OF THE SERVICE
How to set priorities and SLA for tickets?
The deadline should result from the actual impact of the fault and the agreed service conditions.
Read the guideGuides describe working with the tool. They do not replace device instructions, safety procedures or required technical inspections.